Skip to content
VetrixData Licensing
Your estimate

What could your company earn?

This starts at the top of the range. Set your company's size and records, and the estimate updates as you go.

Estimate$150,000Estimate for 250+ staff, US pricing

An estimate, not a promise. Your offer depends on what the system check finds, up to the amount for your size.

Strength
Strong
Needs workGoodStrong
Where do most of your staff work?
Staff at peak
Years of records
Tools in daily use
Total data, roughly
Sector

A larger headcount, more data, and more tools in daily use move the strength label. They do not move the dollar amount. You need at least two years of records to qualify.

Check your eligibility

Industries

Energy, oil and gas: what your operating records are worth to AI research

An energy operator's unit of work is the shift or the field job: what was inspected, produced or shut in. Employee names and landowner contact details in those logs are personal details and are excluded. A license covers the operational record, not a reserve estimate.

Last checked

Up to $150K · $0 cost · 3 days

Sector facts that are not on the sibling pages
FactDetail
Unit of workshift or field job
First exclusionemployee names in logs
First ruleThe record rules in 18 CFR part 125 apply to books of account and other records prepared by or on behalf of a public utility or licensee. Each utility or licensee designates a person to supervise preservation and authorized destruction, and it protects those records from fire, floods, and other hazards. If records are destroyed or lost before the retention period ends, a certified statement listing the records and the circumstances must be filed with the Commission within 90 days of discovery. Records related to hydroelectric facilities must be retained until the Commission has determined the actual legitimate original cost of the facilities, or the licenses are surrendered. eCFR
Second ruleThe record rules in 18 CFR part 225 apply to books of account and other records prepared by or on behalf of a natural gas company. Records related to plant in service must be retained until the facilities are permanently removed from service, removal and restoration are completed, and all costs are retired from the accounting records, unless a regulatory commission has approved the accounting adjustments. If the plant is sold, the associated records or copies must be transferred to the new owners. The company must arrange, file, and index records so they can be identified and made available to Commission representatives. eCFR

What Energy, oil and gas operating records look like

Energy operating records are the shift or field job: what was inspected, produced, or shut in, and they are not the employee's name or the landowner's phone.

Starting a shift or a job records the site, the crew role, and the work order for the day. Recording what was produced or shut in records volumes and exceptions as operations, not as a person's file. Employee names and landowner contacts are personal details.

Other sectors are grouped under company data licensing by industry.

The license itself is explained in how to sell company data to AI companies.

Workflows in Energy, oil and gas that AI research can learn from

Starting a shift or a job, recording what was produced or shut in, and handing over to the next crew are three trails inside one shift or field job.

  1. starting a shift or a job
  2. recording what was produced or shut in
  3. handing over to the next crew

Handing over to the next crew records what was left open. The full shift matters because a production total hides the exception the next crew inherited.

For a related sector's records, read manufacturing company data for AI research or logistics company data for AI research.

Systems Energy, oil and gas companies usually run

Mail, chat, and file storage hold the desk side of a shift or field job. An operations historian is named only as plain text.

Microsoft 365 holds the daily report. Slack holds the handover thread. Dropbox holds exported logs that still need names removed. The operations historian holds the tag data and is listed as plain text.

Where the work sits
SystemCategoryWhy it holds this sector's work
Microsoft 365Email and collaborationDaily reports sit in mail and documents.
SlackChatCrew handover threads sit in chat.
DropboxDocuments and storageExported logs sit in file storage.
operations historianIndustry systemTag history sits in the operations historian.

What a Energy, oil and gas license leaves out

Employee names in logs and landowner contact details stay out, even when they were written on the shift or field job itself.

  • employee names in logs
  • landowner contact details

Employee names in logs identify the person on the tour. Landowner contact details identify a person with a surface right. Neither one is a reserve estimate, and a license does not value reserves.

The details that never leave any company are listed in what is never shared.

Rules cited for Energy, oil and gas records

A note about a shift or field job quotes a specific public operations rule, and it includes no reserve or royalty figure.

The notes quote record-retention rules for public utilities and natural gas companies, pipeline procedure rules, the spill-prevention plan, and process safety management where a chemical threshold is met. They include no reserve figure and no royalty figure. They do not say an operator qualifies.

What each source says
RuleWhat the source saysSource
18 CFR 125.2 — General instructionsThe record rules in 18 CFR part 125 apply to books of account and other records prepared by or on behalf of a public utility or licensee. Each utility or licensee designates a person to supervise preservation and authorized destruction, and it protects those records from fire, floods, and other hazards. If records are destroyed or lost before the retention period ends, a certified statement listing the records and the circumstances must be filed with the Commission within 90 days of discovery. Records related to hydroelectric facilities must be retained until the Commission has determined the actual legitimate original cost of the facilities, or the licenses are surrendered.eCFR
18 CFR 225.2 — General instructionsThe record rules in 18 CFR part 225 apply to books of account and other records prepared by or on behalf of a natural gas company. Records related to plant in service must be retained until the facilities are permanently removed from service, removal and restoration are completed, and all costs are retired from the accounting records, unless a regulatory commission has approved the accounting adjustments. If the plant is sold, the associated records or copies must be transferred to the new owners. The company must arrange, file, and index records so they can be identified and made available to Commission representatives.eCFR
49 CFR 192.603 — General provisionsNo person may operate a segment of gas pipeline unless it is operated in accordance with 49 CFR part 192, subpart L. Each operator shall keep records necessary to administer the procedures established under 49 CFR 192.605. The Associate Administrator, or a certified state agency, may require the operator to amend its plans and procedures to provide a reasonable level of safety, after notice and an opportunity for hearing.eCFR
49 CFR 195.402 — Procedural manual for operations, maintenance, and emergenciesEach operator of a hazardous liquid or carbon dioxide pipeline shall prepare and follow, for each pipeline system, a manual of written procedures for normal operations and maintenance and for abnormal operations and emergencies. The manual is reviewed at intervals not exceeding 15 months, and at least once each calendar year. It is prepared before initial operations begin, and appropriate parts are kept where operations and maintenance activities are conducted. The manual includes procedures for making construction records, maps, and operating history available as necessary for safe operation and maintenance.eCFR
40 CFR 112.3 — Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure PlanThe owner or operator of an onshore or offshore facility subject to 40 CFR 112.3 must prepare in writing and implement a Spill Prevention, Control, and Countermeasure Plan. Except as 40 CFR 112.6 provides, a licensed Professional Engineer must review and certify the plan. If the facility is normally attended at least four hours a day, a complete copy is kept at the facility. If it is not, the copy is kept at the nearest field office. The plan is available to the Regional Administrator for on-site review during normal working hours.eCFR
29 CFR 1910.119 — Process safety management of highly hazardous chemicalsProcess safety management under 29 CFR 1910.119 contains requirements for preventing or minimizing the consequences of catastrophic releases of toxic, reactive, flammable, or explosive chemicals. It applies to a process that involves a chemical at or above the threshold quantities in appendix A to that section, and to a process that involves a Category 1 flammable gas or a flammable liquid with a flashpoint below 100 degrees Fahrenheit on site in one location in a quantity of 10,000 pounds or more, with the fuel exceptions the section lists. It does not apply to retail facilities, to oil or gas well drilling or servicing operations, or to normally unoccupied remote facilities. Before any process hazard analysis, the employer completes a written compilation of process safety information on the hazards, the technology, and the equipment.eCFR

Wind-down specifics for Energy, oil and gas

Shutting in a site does not turn named logs into a licensable archive. The shift or field job is the record, and personal details stay out.

Export the shift log with names removed. Leave landowner files and personnel records out. A shut-in does not price the reservoir.

  • Export the shift log with names removed.
  • Leave landowner files and personnel records out.
  • A shut-in does not price the reservoir.

General information only. This is not legal, tax or financial advice.

  • Industries

    What operating records look like by sector, and what is left out.

  • How to sell company data

    How to sell or license company data to AI companies, and which route fits.

  • What's shared

    Which records can be licensed, which details never leave, and what you approve.

  • Eligibility

    Staff, records, daily-use systems, and the right to license, plus a checker.

  • Estimate

    US payout bands by staff at peak, and the estimator that uses them.

  • Manufacturing

    Work orders, with worker names left out.

  • Logistics

    Shipments, with consignee and driver details left out.

Questions about energy company data for AI research

Which employee and landowner details never leave an energy operator in a license?

Employee names in logs never leave an energy operator in a license. Landowner contact details stay out with them. The shift or field job that can be described is what was inspected, produced, or shut in. The person on the tour, and the person with a surface right, are personal details. A license covers that operational record. It does not value reserves.

What does a shift log contain once personal details are removed?

Once personal details are removed, a shift log contains the site, the crew role, what was produced or shut in, the exceptions, and what the next crew inherited. Starting a shift or a job, recording production, and handing over to the next crew are the trails. A production total alone hides the exception. The landowner's phone is not in what remains.

Which operations systems should an energy company check for deletion windows?

Check Microsoft 365 for the daily report, Slack for the handover thread, and Dropbox for exported logs that still need names removed. The operations historian holds the tag history and is named only as plain text. Check its retention with the vendor, and do not treat a tag export that still names the crew as ready to discuss. A shut-in does not price the reservoir.

Does producing oil or power change the eligibility floor?

No. Producing oil or power does not change the eligibility floor. The fit check is the same staff and records test used for every sector. The unit of work is the shift or field job, not a reserve estimate. Output does not replace years of records or the removal of employee names and landowner contact details.

Sources

  1. eCFR. 18 CFR 125.2 — General instructions. Checked 2026-11-04
  2. eCFR. 18 CFR 225.2 — General instructions. Checked 2026-11-04
  3. eCFR. 49 CFR 192.603 — General provisions. Checked 2026-11-04
  4. eCFR. 49 CFR 195.402 — Procedural manual for operations, maintenance, and emergencies. Checked 2026-11-04
  5. eCFR. 40 CFR 112.3 — Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan. Checked 2026-11-04
  6. eCFR. 29 CFR 1910.119 — Process safety management of highly hazardous chemicals. Checked 2026-11-04

Get up to$150,000for how your company works

See if your energy records qualify

Check eligibility